{"id":5494,"date":"2025-05-17T06:02:48","date_gmt":"2025-05-16T22:02:48","guid":{"rendered":"https:\/\/cicserver.com\/extreme-heat-risks-summer-power-shortages-warns-largest-us-grid\/"},"modified":"2025-05-17T06:02:48","modified_gmt":"2025-05-16T22:02:48","slug":"extreme-heat-risks-summer-power-shortages-warns-largest-us-grid","status":"publish","type":"post","link":"https:\/\/cicserver.com\/de\/extreme-heat-risks-summer-power-shortages-warns-largest-us-grid\/","title":{"rendered":"Extreme Heat Risks Summer Power Shortages, Warns Largest US Grid"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div data-module=\"content\">\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\"><span class=\"ContentText ContentText_variant_bodyNormal\" data-testid=\"content-text\">(Bloomberg) &#8212; PJM Interconnection, the largest US electric grid serving about 20% of Americans from the Midwest to East Coast, warned that extreme heat this summer could trigger supply shortages for the first time.\u00a0<\/span><\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\"><span class=\"ContentText ContentText_variant_bodyNormal\" data-testid=\"content-text\">While PJM expects to have enough power supply to meet typical summer demand, \u201cavailable generation capacity may fall short of required reserves\u201d under severe conditions that lift demand as high as 166 gigawatts, the grid operator\u00a0said Friday (May 9).<\/span><\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\"><span class=\"ContentText ContentText_variant_bodyNormal\" data-testid=\"content-text\">Such an extreme scenario would topple the 2006 record of 165.6 GW. One megawatt is typically enough to power 800 homes in PJM.\u00a0<\/span><\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\"><span class=\"ContentText ContentText_variant_bodyNormal\" data-testid=\"content-text\">PJM expects this summer to be hotter than normal, especially in the Eastern seaboard states, with demand rising 0.9% to peak at 154.1 GW. The grid operator noted it has another 7.9 gigawatts of spare supplies available through demand-response programs, which compel enrolled commercial, industrial, and even household consumers to curtail usage to keep the grid stable during emergencies.\u00a0<\/span><\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\"><span class=\"ContentText ContentText_variant_bodyNormal\" data-testid=\"content-text\">While it\u2019s impossible to predict the likelihood of an extreme scenario, PJM\u2019s warning underscores the demand constraints of a grid that was recently flush with supply.\u00a0<\/span><\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\"><span class=\"ContentText ContentText_variant_bodyNormal\" data-testid=\"content-text\">\u201cPJM continues to voice concerns about the supply and demand imbalance driven by generator retirements and the slow build of new resources in the face of accelerating demand growth,\u201d the statement said.\u00a0<\/span><\/p>\n<p data-component=\"related-article\" class=\"RelatedArticle\"><span data-testid=\"related-article-title\" class=\"RelatedArticle-Title\">Related:<\/span><a class=\"RelatedArticle-RelatedContent\" href=\"https:\/\/www.datacenterknowledge.com\/sustainability\/beyond-efficiency-redefining-data-center-sustainability-for-the-ai-era\" target=\"_self\" data-discover=\"true\">Beyond Efficiency: Redefining Data Center Sustainability for the AI Era<\/a><\/p>\n<\/div>\n<p><script defer=\"\" async=\"\" src=\"https:\/\/connect.facebook.net\/en_US\/sdk.js#xfbml=1&amp;version=v18.0\" data-ot-ignore=\"true\"><\/script><br \/>\n<br \/><\/p>","protected":false},"excerpt":{"rendered":"<p>(Bloomberg) &#8212; PJM Interconnection, the largest US electric grid serving about 20% of Americans from the Midwest to East Coast, warned that extreme heat this summer could trigger supply shortages for the first time.\u00a0 While PJM expects to have enough power supply to meet typical summer demand, \u201cavailable generation capacity may fall short of required [&hellip;]<\/p>","protected":false},"author":3,"featured_media":5495,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[1],"tags":[],"class_list":{"0":"post-5494","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-blog"},"_links":{"self":[{"href":"https:\/\/cicserver.com\/de\/wp-json\/wp\/v2\/posts\/5494","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cicserver.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cicserver.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cicserver.com\/de\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cicserver.com\/de\/wp-json\/wp\/v2\/comments?post=5494"}],"version-history":[{"count":0,"href":"https:\/\/cicserver.com\/de\/wp-json\/wp\/v2\/posts\/5494\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cicserver.com\/de\/wp-json\/wp\/v2\/media\/5495"}],"wp:attachment":[{"href":"https:\/\/cicserver.com\/de\/wp-json\/wp\/v2\/media?parent=5494"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cicserver.com\/de\/wp-json\/wp\/v2\/categories?post=5494"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cicserver.com\/de\/wp-json\/wp\/v2\/tags?post=5494"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}